| ID | Action title | Implementation phase | Status | Tasks | Information updated | Council Prioritization Score | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BE-1.1SA-1 | Complete an analysis of the City's building and housing stock. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 01/14/2025 | 87.7 | ||||||
| BE-1.1a | Develop a comprehensive building decarbonization roadmap. | Planning Implementation phase:
| On time | 3 tasks Tasks
| 17 days ago Latest update 10/26/2026 | 87.7 | ||||||
| BE-1.1SA-2 | Update the Building Energy Benchmarking Ordinance to expand enforcement and compliance. | In progress Implementation phase:
| On time | 3 tasks Tasks
| 2 years ago Latest update 01/14/2025 | 48.73 | ||||||
| BE-1.1b | Develop a Building Performance Standards (BPS) policy. | In progress Implementation phase:
| On time | 7 tasks Tasks
| 17 days ago Latest update 10/26/2026 | 48.73 | ||||||
| BE-1.1SA-3 | Explore opportunities to increase onsite water reuse and irrigation for buildings. | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/29/2025 | 11.27 | ||||||
| BE-1.1SA-4 | Prioritize cool roofs when feasible in energy efficiency building code update. | In progress Implementation phase:
| On time | 2 tasks Tasks
| a year ago Latest update 12/09/2025 | 35.36 | ||||||
| BE-1.1SA-5 | Identify funding sources for residential weatherization projects, appliance exchanges, and building retrofits in CoC's. | Continuous Implementation phase:
| Continuous | 3 tasks Tasks
| 17 days ago Latest update 10/26/2026 | 71.93 | ||||||
| BE-1.1SA-6 | Expand residential Photovoltaic deployment incentives/programs | In progress Implementation phase:
| On time | 2 tasks Tasks
| 5 months ago Latest update 06/19/2026 | 56.75 | ||||||
| BE-1.1SA-7 | Develop programs to promote energy efficiency and load management technologies with an emphasis in Communities of Concern | Continuous Implementation phase:
| Continuous | 2 tasks Tasks
| a year ago Latest update 12/09/2025 | 30.9 | ||||||
| BE-1.2a | Develop and adopt a Building Electrification policy...requiring new residential and commercial buildings to eliminate the use of natural gas... | In progress Implementation phase:
| Late | 4 tasks Tasks
| a year ago Latest update 12/09/2025 | 57.05 | ||||||
| BE-1.2SA-1 | Prioritize cool roofs in energy efficiency building code update. | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 12/09/2025 | 35.36 | ||||||
| BE-1.2SA-2 | Support new regional policies for alternative systems...to replace existing heating and cooling air systems and water systems | In progress Implementation phase:
| On time | 1 tasks Tasks
| a year ago Latest update 12/09/2025 | 36.66 | ||||||
| BE-1.2SA-3 | Establish policies that incentivize developers to use less GHG intensive materials and practices... | Not started Implementation phase:
| 5 tasks Tasks
| a year ago Latest update 09/30/2025 | 32.27 | |||||||
| BE-1.3a | Develop municipal energy implementation plan and municipal zero carbon emissions buildings and operations policies. | Completed Implementation phase:
| On time | 3 tasks Tasks
| 2 years ago Latest update 03/19/2025 | 46.77 | ||||||
| BE-1.3SA-1 | Implement energy efficiency projects at City facilities to meet zero emissions goals... | In progress Implementation phase:
| On time | 11 tasks Tasks
| 19 days ago Latest update 10/23/2026 | 48.83 | ||||||
| BE-1.3SA-2 | Identify and prioritize energy projects at City facilities that increase resiliency... | In progress Implementation phase:
| On time | 6 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 53.78 | ||||||
| BE-1.3SA-3 | Implement technologies...at City facilities to meet the zero emissions goals...established in the Municipal Energy Strategy & Implementation Plan. | In progress Implementation phase:
| On time | 17 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 47.75 | ||||||
| BE-1.3SA-4 | Convert all street lights to LEDs and explore auto-dimming technology where public safety would not be compromised | In progress Implementation phase:
| On time | 2 tasks Tasks
| a year ago Latest update 12/09/2025 | 45.41 | ||||||
| BE-1.3SA-5 | Convert all traffic signals to LED lights | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 06/24/2024 | 22.16 | ||||||
| BE-1.3SA-6 | Future development on City-owned property will require and reward proposals based on decarbonization and other CAP goals | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 03/19/2025 | 28.29 | |||||||
| BE-SA-1 | Remove high-Global Warming Potential refrigerants - develop a refrigerant management program that establishes a phaseout timeline for high-Global Warming Potential refrigerants | Not started Implementation phase:
| No tasks No tasks | a year ago Latest update 09/22/2025 | 28.16 | |||||||
| BE-SA-2 | Advance workforce development programs for decarbonization including energy efficiency and renewable energy projects | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 12/09/2025 | 33.5 | ||||||
| RE-2.1a | Partner with SDCP to increase customer adoption of 100% renewable energy supply. | In progress Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/09/2026 | 40.66 | ||||||
| RE-2.1b | Partner with SDCP to incentivize local generation of renewable energy resources. | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/16/2025 | 44.15 | ||||||
| RE-2.1-SA-1 | Develop financial support programs to incentivize solar on multifamily buildings, providing financial benefits to tenants and families within Communities of Concern | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 12/09/2025 | 39.76 | ||||||
| RE-2.1-SA-2 | Develop financial support programs to incentivize deployment of building-scale renewables and mandate the use of renewables through building codes, while engaging residents and other stakeholders in the process. | In progress Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/09/2026 | 49.43 | ||||||
| RE-2.1-SA-3 | Increase renewable generation at non-residential developments through new policies or incentive programs. | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 06/24/2024 | 37.27 | |||||||
| RE-2.1-SA-4 | Facilitate local renewable energy resource deployment through land use code update | Completed Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 12/09/2025 | 34.39 | ||||||
| RE-2.1-SA-5 | Deploy advanced renewable energy technologies (e.g. battery energy storage systems, microgrids, etc.) at municipal facilities to demonstrate feasibility. | In progress Implementation phase:
| On time | 8 tasks Tasks
| a year ago Latest update 12/09/2025 | 37.79 | ||||||
| RE-2.1-SA-6 | Leverage municipal facilities to establish community solar and microgrid solutions when tariffs allow. | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 12/09/2025 | 38.03 | ||||||
| RE-2.1-SA-7 | Explore partnerships for a trade-in program for small landscape owners to transition to electric equipment. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 06/24/2024 | 33.19 | ||||||
| RE-2.2a | Develop a City Fleet Vehicle Replacement and Electrification strategy consistent with the Municipal Energy Implementation Plan and state requirements for municipal electrification. | Completed Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 03/19/2025 | 49.78 | ||||||
| RE-2.2-SA-1 | Conduct City fleet electrification feasibility study to determine best siting, funding needs, and strategies including specific strategies for Chollas Operations Yard. | Completed Implementation phase:
| On time | 1 tasks Tasks
| 2 years ago Latest update 03/19/2025 | 49.78 | ||||||
| RE-2.2-SA-2 | Seek partnerships with SDCP, SDG&E and others to install charging infrastructure for all vehicle types | Planning Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/16/2025 | 43.9 | ||||||
| RE-2.2-SA-3 | Include stated preference for 100% renewable energy on publically available chargers on municipal land | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/11/2024 | 32.33 | ||||||
| RE-2.2-SA-4 | Update AR35.80 to include EV vehicles to the list of preferred purchases | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 04/08/2025 | 32.33 | ||||||
| RE-2.2-SA-5 | Update municipal parking yard electric infrastructure to support electric vehicle charging needs | In progress Implementation phase:
| On time | 5 tasks Tasks
| 19 days ago Latest update 10/23/2026 | 44.87 | ||||||
| RE-2.2-SA-6 | Create standards for the City’s purchase of fuel for fleet vehicles that contains the lowest levels of lifecycle GHG emissions available. | Planning Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 03/19/2025 | 45.14 | ||||||
| RE-2.2-SA-7 | Explore pilot projects for a variety of grid resilience services (demand response, emergency back-up, demand charge reduction, etc.) through three modes of EV integration (Grid-to-Vehicle, Vehicle-to-Building, Vehicle-to-Grid) | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 12/09/2025 | 34.9 | ||||||
| RE-2.3a | Develop a city-wide electric vehicle strategy to accelerate EV adoption... | Completed Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 11/08/2024 | 77.5 | ||||||
| RE-2.3-SA-1 | Set a goal to install public EV charging stations on city property to support EV adoption in Communities of Concern. | Completed Implementation phase:
| On time | 4 tasks Tasks
| a year ago Latest update 09/05/2025 | 77.5 | ||||||
| RE-2.3-SA-2 | Work with local businesses to expand EV charging stations on commercial property | Not started Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/10/2026 | 41.2 | ||||||
| RE-2.3-SA-3 | Amend the building code update to expand EV charging stations requirements... | In progress Implementation phase:
| On time | 1 tasks Tasks
| a year ago Latest update 12/10/2025 | 69.4 | ||||||
| RE-2.3-SA-4 | Amend the building code to require charging stations for electric bicycles. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/11/2024 | 36.81 | ||||||
| RE-2.3-SA-5 | Explore the development of a citywide policy for surplus land...to be considered for EV charging sites... | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 03/19/2025 | 26.99 | |||||||
| RE-2.3-SA-6 | Continue...to support the conversion of the school bus fleet to zero emissions vehicles. | Not started Implementation phase:
| No tasks No tasks | a year ago Latest update 09/25/2025 | 40.96 | |||||||
| RE-2.3-SA-7 | Work with SANDAG, APCD and MTS to procure a fully zero emissions bus fleet | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 09/11/2024 | 62.15 | |||||||
| RE-2.3-SA-8 | Work with SANDAG, APCD, U.S. Navy, the Port of San Diego and other partners on medium and heavy duty (MD/HD) ZEV infrastructure planning. | Not started Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/10/2026 | 64.88 | ||||||
| MLU-3.1a | Develop Safe Routes to Schools safety plans; start a San Diego Safe Routes to Schools program focusing on Communities of Concern and underperforming schools | Planning Implementation phase:
| On time | 3 tasks Tasks
| 2 years ago Latest update 09/11/2024 | 59.74 | ||||||
| MLU-3.1-SA1 | Adopt City portions of SANDAG's forthcoming first mile/last mile initiative and incorporate Safe Routes to Transit strategies in Transit Priority Areas | Not started Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/09/2026 | 43.93 | ||||||
| MLU-3.1-SA2 | Partner with public safety to review and reform education programs and enforcement policies related to pedestrian and traffic safety. | Continuous Implementation phase:
| Continuous | 4 tasks Tasks
| a year ago Latest update 09/16/2025 | 47.87 | ||||||
| MLU-3.1-SA3 | Increase education campaigns to improve motorist behavior to result in a safer right-of-way for bicyclists and pedestrians. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 39.62 | ||||||
| MLU-3.1-SA4 | Amend the code and street design manual to include standards for pedestrian oriented street lighting in neighborhoods and alleyways. | In progress Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 03/20/2025 | 47.53 | ||||||
| MLU-3.1-SA5 | Install pedestrian-oriented streetlights for increased safety and comfort in Communities of Concern. | Continuous Implementation phase:
| Continuous | 2 tasks Tasks
| a year ago Latest update 09/16/2025 | 53.38 | ||||||
| MLU-3.1b | Update Bicycle Master Plan with current best practices... | In progress Implementation phase:
| On time | 7 tasks Tasks
| 22 days ago Latest update 10/20/2026 | 39.32 | ||||||
| MLU-3.1-SA6 | Include in Bicycle Master Plan update policies and programs to increase bicycle storage near new bikeways | Completed Implementation phase:
| On time | 6 tasks Tasks
| 22 days ago Latest update 10/20/2026 | 37.87 | ||||||
| MLU-3.1c | Implement the City's Bicycle Master Plan and community plan bicycle networks with a Class IV First approach. | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/12/2024 | 42.58 | ||||||
| MLU-3.1d | Develop a Mobility Master Plan to reduce mobile sources emissions and further a shift in mode | Completed Implementation phase:
| On time | 3 tasks Tasks
| 2 years ago Latest update 04/23/2025 | 65.68 | ||||||
| MLU-3.1-SA7 | Complete and implement the Mobility Master Plan... | In progress Implementation phase:
| On time | 5 tasks Tasks
| a year ago Latest update 09/16/2025 | 47.89 | ||||||
| MLU-3.1-SA8 | Create a quick build policy and design guidelines to facilitate repurposing of the right-of-way for installation of interim or pilot bicycle, ADA accessibility, or pedestrian projects | In progress Implementation phase:
| On time | 4 tasks Tasks
| 22 days ago Latest update 10/20/2026 | 41.74 | ||||||
| MLU-3.1-SA9 | Examine proposed bike and pedestrian projects and use "quick-build" pathways where appropriate to increase financial viability | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 03/20/2025 | 41.38 | ||||||
| MLU-3.1-SA10 | Identify and address gaps in the City's pedestrian network and opportunities for improved pedestrian crossing, using the City's Pedestrian Master Plan and the City's sidewalk assessment | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 50.5 | ||||||
| MLU-3.1-SA11 | Incorporate trees and additional cooling features such as innovative shade designs, water features, and cooling centers at parks, with a concentration in Communities of Concern | Continuous Implementation phase:
| Continuous | No tasks No tasks | 18 days ago Latest update 10/24/2026 | 50.29 | ||||||
| MLU-3.1-SA12 | Include shade structures on building frontages in pedestrian thoroughfares. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/12/2024 | 37.3 | ||||||
| MLU-3.1-SA13 | Update street planning and design process with a focus on community input from Communities of Concern to prioritize pedestrians, bicyclists, and transit | Continuous Implementation phase:
| Continuous | 1 tasks Tasks
| a year ago Latest update 10/08/2025 | 46.44 | ||||||
| MLU-3.1-SA14 | Include audible pedestrian signals at all signal-controlled crosswalks | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 35.31 | ||||||
| MLU-3.1-SA15 | Install audible wayfinding beacons at complicated intersections and sign locations | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 35.31 | ||||||
| MLU-3.1-SA16 | Increase number of trash and recycling receptacles in pedestrian corridors/Transit Priority Areas | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 04/08/2025 | 39.54 | ||||||
| MLU-3.1-SA17 | Implement Assembly Bill 43 to reduce speed limits in select corridors | In progress Implementation phase:
| On time | 2 tasks Tasks
| 17 days ago Latest update 10/25/2026 | 40.65 | ||||||
| MLU-3.1-SA18 | Update City special events permits to prioritize transit, walking, and bicycling | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/12/2024 | 50.26 | ||||||
| MLU-3.1-SA19 | Amend Council Policy 800-14 to prioritize CAP implementation with a greater investment in Communities of Concern, [cont]... | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/12/2024 | 47.91 | ||||||
| MLU-3.1e | Evaluate existing and future fee structures to increase the priority of active transportation project implementation... | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 03/20/2025 | 37.4 | ||||||
| MLU-3.1-SA20 | Explore fee structure/incentive program to increase cost savings for shared transportation network company (TNC) trips relative to private TNC trips | Not started Implementation phase:
| 1 tasks Tasks
| 2 years ago Latest update 09/12/2024 | 46.34 | |||||||
| MLU-3.1f | Review and improve flexible fleets and micro-mobility policies/shared use mobility programs, especially focused in Communities of Concern and first mile/last mile applications | Continuous Implementation phase:
| Continuous | 4 tasks Tasks
| a year ago Latest update 09/16/2025 | 44.98 | ||||||
| MLU-3.1g | Partner with Microbility Operators to optimize the number of scooters available in mobility hubs and/or near transit | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 52.15 | ||||||
| MLU-3.1-SA21 | Implement the City’s San Diego River Park Master Plan to increase mobility | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/12/2024 | 51.57 | ||||||
| MLU-3.1-SA22 | Where roadway widenings are otherwise planned, identify opportunities to repurpose the use of the right-of-way for walking, rolling, biking, and transit modes of travel | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/12/2024 | 47.05 | ||||||
| MLU-3.1-SA23 | Ensure that Capital Improvement Projects comply with all applicable landscape requirements in the Land Development Code | Completed Implementation phase:
| On time | No tasks No tasks | 6 months ago Latest update 05/06/2026 | 43.69 | ||||||
| MLU-3.1-SA24 | Engage communities during the community plan updates and other multimodal corridors and active transportation planning processes to better accommodate all users of the right-of-way with an emphasis on improving safety for vulnerable users | Continuous Implementation phase:
| Continuous | 1 tasks Tasks
| 17 days ago Latest update 10/26/2026 | 34.8 | ||||||
| MLU-3.2a | Advocate for a permanent, regional Youth Opportunity Pass and support the expansion of the program to include college students and residents in Communities of Concern | Planning Implementation phase:
| On time | 3 tasks Tasks
| 2 years ago Latest update 09/12/2024 | 73.48 | ||||||
| MLU-3.2-SA1 | Facilitate partnerships with universities and colleges with goal of student walk/ride/transit use well-above citywide goals | In progress Implementation phase:
| On time | 3 tasks Tasks
| a year ago Latest update 09/16/2025 | 44.59 | ||||||
| MLU-3.2-SA2 | Create programs and incentives for transit passes bundled with all new major developments within one mile of a major transit stop | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 06/25/2024 | 46.97 | ||||||
| MLU-3.2b | Create a quick build policy and design guidelines to facilitate repurposing of the right-of-way for installation of interim or pilot transit projects | Not started Implementation phase:
| No tasks No tasks | 22 days ago Latest update 10/20/2026 | 31.36 | |||||||
| MLU-3.2-SA3 | Identify transit stops where upgrades are needed, especially in Communities of Concern, and streamline implementation of upgrades to high priority transit stops | Planning Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/29/2025 | 55.14 | ||||||
| MLU-3.2c | Ensure every high-volume transit stop has access to transit shelters... | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 44.1 | ||||||
| MLU-3.2d | Implement projects and update the Placemaking Ordinance, including a street furniture program that reduces heat exposure, prioritizes natural shade solutions, provides cool transit stops, and improves access to nearby restrooms in high transit use areas and pedestrian corridors, prioritizing Communities of Concern | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/29/2025 | 51.52 | ||||||
| MLU-3.2-SA4 | Support MTS, SANDAG and Caltrans in the creation of transit right-of-way for regional transit connections | Continuous Implementation phase:
| Continuous | 1 tasks Tasks
| a year ago Latest update 09/16/2025 | 40.88 | ||||||
| MLU-3.2e | Develop dedicated bus lanes or shared bus and bike lanes to increase transit efficiency and on-time performance... | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 43.81 | ||||||
| MLU-3.2-SA5 | Prioritize and assist MTS with siting and design on complete transit stops in CoC, including shade trees, lighting, trash bins | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 42.02 | ||||||
| MLU-3.2-SA6 | Partner with MTS for priority right of way for buses and trolley in roadway corridors and at intersections | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 55.14 | ||||||
| MLU-3.3a | Amend the Land Development Code to include mandatory transportation demand management (TDM) regulations citywide. | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 06/25/2024 | 47.34 | |||||||
| MLU-3.3b | Develop a City of San Diego employee TDM policy. | In progress Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 06/25/2024 | 43.18 | ||||||
| MLU-3.3c | Establish a team and roadmap to support actions that require connectivity and close the digital divide. | Continuous Implementation phase:
| Continuous | 3 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 47.71 | ||||||
| MLU-3.3-SA1 | Create a Digital Navigator support line. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 45.19 | ||||||
| MLU-3.3-SA2 | Create a Digital Literacy program | Completed Implementation phase:
| On time | 2 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 46.87 | ||||||
| MLU-3.3-SA3 | Loan mobile hotspots and personal computers to residents. | Continuous Implementation phase:
| Continuous | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 48.7 | ||||||
| MLU-3.3-SA4 | Provide Public WiFi access at various public areas in Low-to-Moderate Income (LMI) areas. | Continuous Implementation phase:
| Continuous | 1 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 47.71 | ||||||
| MLU-3.3-SA5 | Formalize a regional device refurbishment and distribution program | In progress Implementation phase:
| On time | 1 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 46.54 | ||||||
| MLU-3.3-SA6 | Work with local organizations to distribute refurbished devices previously used by the City to residents at low or no costs | Continuous Implementation phase:
| Continuous | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 49.87 | ||||||
| MLU-3.3-SA7 | Enhance data collection and outreach in Communities of Concern. Identify residents in need of technology assistance, understand barriers to remote work, and improve community access to technology. | Completed Implementation phase:
| On time | 2 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 47.71 | ||||||
| MLU-3.4a | Install traffic circles and roundabouts | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/16/2025 | 44.24 | ||||||
| MLU-3.4b | Retime traffic signals to reduce vehicle fuel consumption through improving the flow of traffic | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 43.02 | ||||||
| MLU-3.4-SA1 | Work with the Port of San Diego, SANDAG, and Caltrans to prepare a feasibility study to identify the best truck route to Tenth Avenue Marine Terminal and diversion, traffic calming and appropriate signage as included in the APCD’s Community Emission Reduction Plan (CERP) | In progress Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 09/13/2024 | 38.64 | ||||||
| MLU-3.4-SA2 | Work with communities to implement comprehensive solutions for the curb space... | Continuous Implementation phase:
| Continuous | 4 tasks Tasks
| a year ago Latest update 09/16/2025 | 34.63 | ||||||
| MLU-3.5a | Update the Placemaking Ordinance to better support mode shift, to increase accessibility, walkability, and activate public spaces | Completed Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/09/2025 | 36.97 | ||||||
| MLU-3.5-SA1 | Amend local regulations, like the Placemaking ordinance, and policies to allow for wider sidewalks and the use of setbacks for public spaces and place making | Completed Implementation phase:
| On time | 1 tasks Tasks
| 2 years ago Latest update 09/13/2024 | 41.76 | ||||||
| MLU-3.5-SA2 | Implement temporary and permanent car-free zones/zero emission zones | Continuous Implementation phase:
| Continuous | 2 tasks Tasks
| a year ago Latest update 09/11/2025 | 57.74 | ||||||
| MLU-3.5-SA3 | Amend the General Plan Mobility Element to include a Complete Streets policy to enable safe, attractive and comfortable access so that pedestrians, bicyclists, motorists and transit users of all ages and abilities can safely travel within the public right-of-way | Completed Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 03/20/2025 | 52.33 | ||||||
| MLU-3.5-SA4 | Amend land development code regulations to require more efficient pedestrian access between existing and new development. | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 03/19/2025 | 51.53 | |||||||
| MLU-3.5-SA5 | Prioritize as part of the Environmental Justice work on air quality emissions reduction opportunities with APCD and Communities of Concern | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 03/19/2025 | 66.16 | ||||||
| MLU-3.5b | Focus new development in areas that will allow residents, employees and visitors to safely, conveniently, and enjoyable travel as a pedestrian, or by biking, or transit, such as in Transit Priority Areas (TPAs), and areas of the City with the lowest amount of vehicular travel. | Continuous Implementation phase:
| Continuous | 2 tasks Tasks
| a year ago Latest update 09/17/2025 | 63.8 | ||||||
| MLU-3.5c | Plan for land uses that will allow existing residents, employees and visitors to more safely, conveniently and enjoyably travel as a pedestrian, biking, or transit | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 63.8 | ||||||
| MLU-3.5-SA6 | Focus on delivering new mixed-use development on sites, including vacant and underutilized lots, located near transit, such as in TPAs and areas of the City of San Diego with the lowest amount of vehicular travel. | Continuous Implementation phase:
| Continuous | 2 tasks Tasks
| a year ago Latest update 09/11/2025 | 40.67 | ||||||
| MLU-3.5-SA7 | Implement active transportation in lieu fees to fund pedestrian, cyclist and transit investments where the greatest GHG emissions reductions will result, in accordance with Complete Communities: Mobility Choices | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/25/2025 | 68.47 | ||||||
| MLU-3.5-SA8 | Maximize new development in areas located with safe, convenient and enjoyable access to transit | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 55.33 | ||||||
| MLU-3.5-SA9 | Support expansion of urban greenspace including park access, open space, and wildlife corridors where appropriate, along streets to encourage outdoor activity, walking, and increase pedestrian access to parks in Communities of Concern | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 57.64 | ||||||
| MLU-3.6a | Optimize use of curb space including management of on-street parking in TPAs | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/29/2025 | 46.87 | ||||||
| MLU-3.6b | Amend the land development code to eliminate parking minimum requirements | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 03/19/2025 | 58.15 | ||||||
| MLU-3.6c | Amend the land development code to establish parking maximum requirements for use types and locations where appropriate | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 03/19/2025 | 58.15 | ||||||
| MLU-3.6d | Amend the land development code to prohibit new auto-oriented land uses that would create conflicts with walking and bicycling within TPAs | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/11/2025 | 42.7 | ||||||
| CECC-4.1a | Approve and implement the Polystyrene Foam and Single Use Plastics Ordinance. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 06/25/2024 | 45.54 | ||||||
| CECC-4.1b | Expand the Polystyrene Foam and Single Use Plastics Ordinance to phase out Single-Use materials and prioritize reuse rather than disposable goods | In progress Implementation phase:
| On time | 1 tasks Tasks
| a year ago Latest update 09/17/2025 | 33.13 | ||||||
| CECC-4.2a | Capture landfill methane gas emissions | Continuous Implementation phase:
| Continuous | No tasks No tasks | 2 years ago Latest update 04/08/2025 | 54.83 | ||||||
| CECC-4.2b | Update the City’s administrative regulations to include purchasing requirements for sustainable products and food | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 09/13/2024 | 47.32 | |||||||
| CECC-4.2c | Include procurement targets, with a focus on the maintenance of street easements, parks, and other green space...to expand the demand and production of high quality compost in the City | In progress Implementation phase:
| On time | No tasks No tasks | 20 days ago Latest update 10/22/2026 | 36.37 | ||||||
| CECC-4.3a | Create a food council or advisory board with local stakeholders | In progress Implementation phase:
| On time | 4 tasks Tasks
| 2 years ago Latest update 11/12/2024 | 55.92 | ||||||
| CECC-4.3b | Invest in expanding the food waste prevention network - expand infrastructure & partnerships for edible food recovery | In progress Implementation phase:
| On time | 2 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 47.02 | ||||||
| CECC-4.3c | Require food waste prevention, donation and recycling plans for all City food service operations and large events on City managed, leased or owned lands | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 06/25/2024 | 34.89 | ||||||
| CECC-4.3d | Establish a multidisciplinary team of subject matter experts across City departments with a focus on land use, economic growth, neighborhood vitality and healthy food access to work with community members to expand urban agricultural programs and develop policies to encourage community-based farms, including demonstration projects | Not started Implementation phase:
| No tasks No tasks | 9 months ago Latest update 01/30/2026 | 54.91 | |||||||
| CECC-4.3-SA1 | Work with the County and Farm Bureau to support investments in climate-smart agriculture and the local food supply chain | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 06/25/2024 | 29.87 | |||||||
| CECC-4.3-SA2 | Incentivize the incorporation of urban agriculture features including indoor agriculture, edible forestry, community gardens, etc | Not started Implementation phase:
| 1 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 42.61 | |||||||
| CECC-4.3-SA3 | Increase community participation with the Urban Agriculture Incentive Zone (UAIZ) program | Planning Implementation phase:
| On time | 1 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 33.37 | ||||||
| CECC-4.3-SA4 | Partner with County of SD to increase community access to Federal meal programs (EBT, WIC, etc) and incentivize usage of these programs for local food access (CSA, farmers market, retail) | Not started Implementation phase:
| On time | 1 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 30.53 | ||||||
| CECC-4.3-SA5 | Invest in a network of local food sourcing, aggregation, distribution and processing infrastructure including regional food hubs, neighborhood scale commercial kitchens or shared kitchens, and other food businesses, particularly in low-income communities | Not started Implementation phase:
| On time | 1 tasks Tasks
| 20 days ago Latest update 10/22/2026 | 52.84 | ||||||
| CECC-4.3-SA6 | Regulate or activate programs for food businesses to minimize food related carbon emissions...and provide technical assistance and resources. Also include checklist and outreach as part of business licensing process | In progress Implementation phase:
| On time | 2 tasks Tasks
| 2 years ago Latest update 04/08/2025 | 34.89 | ||||||
| CECC-4.3-SA7 | Incorporate food security and reslient food systems into climate resilience and emergency planning | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 20.63 | ||||||
| CECC-4.4a | Update, adopt, and implement the City's Zero Waste Plan | Planning Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 12/12/2024 | 48.64 | ||||||
| CECC-4.4b | Update the Citywide Recycling Ordinance to ban divertible materials (yard waste, food) from residential and commercial trash containers, in compliance with SB 1383 | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 06/25/2024 | 43.2 | ||||||
| CECC-4.4-SA1 | Increase enforcement presence to ensure compliance with recently modified City Recycling Ordinance and increase waste diversion | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 17.3 | ||||||
| CECC-4.4c | Develop a marketing plan for compost and mulch developed within the City. Identify and target compost and mulch markets in urban areas as well as urban agriculture. Partner with industries to increase compost and mulch use including landscaping, stormwater, and water conservation. | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 04/08/2025 | 26.22 | ||||||
| CECC-4.4-SA2 | Support community composting enterprises through strategic partnerships | Continuous Implementation phase:
| Continuous | 2 tasks Tasks
| a year ago Latest update 09/11/2025 | 30.05 | ||||||
| CECC-4.4d | Analyze city regulations and other barriers to developing businesses that reuse or repair consumer goods, where doing so will not adversely impact the surrounding residential neighborhood | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 06/25/2024 | 41.55 | |||||||
| CECC-4.4e | Create a community reuse and repair program to increase waste diversion, reduce material consumption, and develop training and learning opportunities. | In progress Implementation phase:
| No tasks No tasks | 3 months ago Latest update 08/25/2026 | 41.55 | |||||||
| CECC-4.4f | Increase public awareness of and access to opportunities for reuse, product rentals, repair, and donation | Continuous Implementation phase:
| Continuous | No tasks No tasks | 2 years ago Latest update 04/08/2025 | 28.81 | ||||||
| CECC-4.4g | Support and expand citywide reuse infrastructure | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 06/25/2024 | 18.72 | |||||||
| CECC-4.4h | Implement a public mattress recycling drop-off location | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 16.3 | ||||||
| CECC-4.4-SA3 | Evaluate and provide input on State and Federal producer responsibility requirements and laws, to focus on hard to recycle and/or hazardous items impacting San Diego's waste stream | In progress Implementation phase:
| On time | 1 tasks Tasks
| 2 years ago Latest update 11/12/2024 | 12.66 | ||||||
| CECC-4.4-SA4 | Partner with franchise waste haulers to address barriers to increasing diversion rates | In progress Implementation phase:
| On time | 7 tasks Tasks
| a year ago Latest update 09/30/2025 | 41.98 | ||||||
| CECC-4.4i | Continue and enhance public outreach programming that provides residents with strategies for household waste reduction, including from food waste and shipping and packaging (e.g., on-demand deliveries), including outreach in languages that reflect the diverse needs of San Diegans | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 04/08/2025 | 42.3 | ||||||
| CECC-4.4-SA5 | Amend the Construction & Demolition regulations to establish a deconstruction requirement to reduce demolition waste from construction and renovation, facilitate material reuse and create jobs | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 03/19/2025 | 31.98 | |||||||
| CECC-4.5a | Capture methane gas from wastewater treatment | Continuous Implementation phase:
| Continuous | 1 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 48.83 | ||||||
| RIHE-5.1a | Protect, restore, and enhance urban canyons. Support habitat restoration of urban canyons, inclusion of environmental education and recreation opportunities, and continued preservation. | Continuous Implementation phase:
| Continuous | No tasks No tasks | 18 days ago Latest update 10/24/2026 | 51.41 | ||||||
| RIHE-5.1b | Develop an area specific management plan to protect, restore, and preserve wetland and upland areas on City managed lands, prioritizing Communities of Concern | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 40.42 | ||||||
| RIHE-5.1c | Develop Natural Resource Management Plans on all managed preserved lands... | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/16/2025 | 39.11 | ||||||
| RIHE-5.1-SA1 | Prioritize parterships with San Diego's tribes and restorative environmental justice opportunities on wetland restoration projects | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 30.66 | ||||||
| RIHE-5.1-SA2 | Acquire Open Space Conservation Land | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 50.01 | ||||||
| RIHE-5.1-SA3 | Create a pilot carbon farming program on vacant public land or in partnerships with educational institutions and non-profit organizations | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 09/13/2024 | 36.89 | |||||||
| RIHE-5.1-SA4 | Partner with the San Diego River Conservancy and other agencies to identify sequestration opportunities through restoration projects | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 34.59 | ||||||
| RIHE-5.2a | Create a Street Tree Master Plan with a target of planting 100,000 trees by 2035... | Planning Implementation phase:
| Late | 2 tasks Tasks
| 5 months ago Latest update 06/19/2026 | 65.44 | ||||||
| RIHE-5.2b | Conduct a new Urban Tree Canopy assessment. | Completed Implementation phase:
| On time | 1 tasks Tasks
| a year ago Latest update 09/30/2025 | 65.2 | ||||||
| RIHE-5.2c | Increase tree planting in Communities of Concern by identifying city lands/spaces that need trees. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 65.2 | ||||||
| RIHE-5.2d | Reform, streamline, and expand the No Fee Street Tree program to remove [participation] barriers...[for] residents within Communities of Concern. | Completed Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/30/2025 | 44.64 | ||||||
| RIHE-5.2-SA1 | Amend the Land Development Code to increase landscape and parking lot tree planting requirements. | Completed Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 45.14 | ||||||
| RIHE-5.2-SA2 | Revise Council Policies and Municipal Codes to strengthen tree protection policies and enhance tree planting efforts. | Planning Implementation phase:
| Late | No tasks No tasks | 2 years ago Latest update 09/13/2024 | 63.04 | ||||||
| RIHE-5.2-SA3 | Streamline permitting for tree planting, dedicate resources to planting in non-traditional street tree locations, and provide reduced fees or fee waivers in Communities of Concerns | Planning Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/14/2024 | 26.9 | ||||||
| RIHE-5.2e | Develop policies that encourage and incentivize developers, homeowners' associations, and other organizations to preserve, maintain, and plant trees. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/09/2025 | 9.15 | ||||||
| RIHE-5.2-SA4 | Implement a Citywide protocol for tracking planted, removed, and maintained street trees | In progress Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/14/2024 | 65.2 | ||||||
| RIHE-5.2-SA5 | Explore allocating revenue from tree removal fines, including from the placement of utility equipment located in the right of way, and fees to fund the planting of new trees | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 09/14/2024 | 15.15 | |||||||
| RIHE-5.2-SA6 | Expand volunteer programs and partnerships with community organizations to plant and maintain trees. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/09/2025 | 46.47 | ||||||
| RIHE-5.2-SA7 | As established in the Energy Cooperation Agreement with the City and SDG&E, implement the Right Tree, Right Place program (or successor programs), identify additional tree planting locations, assist with tree species ideas, and provide technical support through SDG&E’s arborists | Completed Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/09/2026 | 39.14 | ||||||
| RIHE-5.2-SA8 | Monitor and report on SDG&E’s plans to supplant the City’s efforts with direct in-community charitable support for planting up to 2,500 trees in the City over ten years | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/30/2025 | 31.98 | ||||||
| RIHE-5.2f | Support expansion of urban tree canopy in parks and along active transportation network. Prioritize implementation in Communities of Concern. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 63.04 | ||||||
| RIHE-5.2g | Increase tree planting in Communities of Concern starting with the planting of 40K new trees in these communities by 2030. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/11/2025 | 65.44 | ||||||
| RIHE-5.2-SA9 | Support the creation of new urban green space along freeways and City right-of-way. | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/09/2025 | 46.12 | ||||||
| RIHE-5.2h | Protect and maintain all healthy City trees... by use of policy, code, public outreach and code enforcement | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/09/2025 | 15.15 | ||||||
| RIHE-5.2-SA10 | Ensure the diversification of tree species, including using native tree and shrub species ... | Continuous Implementation phase:
| Continuous | No tasks No tasks | 2 years ago Latest update 09/14/2024 | 22.58 | ||||||
| RIHE-5.2-SA11 | Perform proper maintenance and tree removal to promote a healthy urban forest and safety of trees in public spaces | Continuous Implementation phase:
| Continuous | No tasks No tasks | a year ago Latest update 09/09/2025 | 29.31 | ||||||
| RIHE-5.2-SA12 | Redesign hardscape infrastructure around existing City trees when possible in order to increase large tree canopy cover. | In progress Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/30/2025 | 29.31 | ||||||
| RIHE-5.2i | Develop a plan to increase permeable areas for new trees and restore spaces that have been paved, focused in Communities of Concern | Planning Implementation phase:
| On time | No tasks No tasks | 2 years ago Latest update 09/16/2024 | 49.9 | ||||||
| RIHE-5.2-SA13 | Increase irrigation for trees in Parks and in Street rights-of-way | In progress Implementation phase:
| No tasks No tasks | 3 months ago Latest update 08/25/2026 | 15.15 | |||||||
| RIHE-5.3a | Develop local water supply and reduce dependence on imported water | In progress Implementation phase:
| On time | 5 tasks Tasks
| 21 days ago Latest update 10/21/2026 | 37.37 | ||||||
| RIHE-5.3b | Support ongoing gallon per capita water use (GPCD) targets. | Continuous Implementation phase:
| Continuous | No tasks No tasks | 21 days ago Latest update 10/21/2026 | 14.83 | ||||||
| RIHE-5.3-SA1 | Expand awareness of the City's Rainwater Harvesting Rebates and Grass Replacement Rebates programs... | Continuous Implementation phase:
| Continuous | 5 tasks Tasks
| 19 days ago Latest update 10/23/2026 | 33.4 | ||||||
| RIHE-5.3-SA2 | Advance undergrounding of utilties to provide a means to reduce energy use, increase green space preservation, sustainably process and store water and wastes, securely and efficiently site critical infrastructure, prevent and reverse degradation of the urban environment, and enhance quality of life. | In progress Implementation phase:
| On time | No tasks No tasks | 9 months ago Latest update 02/10/2026 | 21.96 | ||||||
| RIHE-5.3-SA3 | Maximize planning and implementation of green infrastructure at watershed scale and site specific with focused stakeholder engagement efforts in Communities of Concern | Continuous Implementation phase:
| Continuous | No tasks No tasks | 19 days ago Latest update 10/23/2026 | 47.53 | ||||||
| RIHE-5.3-SA4 | Investigate opportunities to capture and reuse rain water | Planning Cancelled or postponed | Cancelled or postponed | No tasks No tasks | 2 years ago Latest update 09/16/2024 | 35.3 | ||||||
| RIHE-5.3-SA5 | Implement Waterways Restoration projects | Continuous Implementation phase:
| Continuous | No tasks No tasks | 19 days ago Latest update 10/23/2026 | 48.13 | ||||||
| RIHE-5.3-SA6 | Increase opportunities for Stormwater harvesting by evaluating new harvesting methodology to determine viability | Planning Cancelled or postponed | Cancelled or postponed | No tasks No tasks | 19 days ago Latest update 10/23/2026 | 31.08 | ||||||
| RIHE-5.3-SA7 | Amend building code regulations to require a percentage of all non-roof (e.g., hardscape) surfaces around new buildings meet certain criteria to reduce urban heat island effect. | Completed Implementation phase:
| On time | No tasks No tasks | a year ago Latest update 09/23/2025 | 48.25 | ||||||
| RIHE-5.3-SA8 | Install cool pavement material on City parking lots and in the public right-of-way, prioritizing Communities of Concern, to increase building energy efficiency and reduce urban heat island effect | Not started Implementation phase:
| No tasks No tasks | 2 years ago Latest update 09/16/2024 | 49.28 |